A Breast Cancer Diagnosis Method based on VIM Feature Selection and Hierarchical Clustering Random Forest Algorithm

A Breast Cancer Diagnosis Method based on VIM Feature Selection and Hierarchical Clustering Random Forest Algorithm

₹5,500.00
Product Code: Python - Machine Learning
Availability: In Stock
Viewed 6342 times

Product Description

Aim:

           To detect the breast cancer using K Nearest Neighbor algorithms with the help of data mining techniques.

 Abstract:

               Breast cancer is one of the most common cancers among the women. Breast cancer can be classified into two benign and malignant. The etiological reason behind the cancer is due to the generation of superoxide’s or free radicals. X-Ray, MRI, Biopsy test are used to detect diseases in now a days. It takes long time for diagnosis .In our study Data mining techniques of machine learning are used to detect disease.

Proposed system:

                 In Proposed system, Data mining is a field of study within machine learning and focuses on research data analysis through unauthorized learning. According to data provided by World health organization (WHO) two million new cases are reported and which of 626,679 were died in year 2018. At this situation the importance of machine learning can be realized. For the early detection of disease machine learning is very helpful. Here for mostly data collected is made to feature selection and classification the separation is done by KNN algorithm. User may give the input in the way of Web application.

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.