Air Engine

Air Engine

** Delivery Charges Extra
CALL FOR PRICE
Product Code: Mechanical - Automobile
Availability: Pre-Order
Viewed 4774 times

Product Description

Aim:

            To design, mechanize and fabrication of an air engine which uses compressed air to power itself instead of fuel like petrol or diesel.


Proposal:

            Here we are going to create an air engine which uses compressed air from a compressor send directly to the cylinder of the engine to perform the strokes and convert the pistons linear movement into rotational movement. It reduces the pollution caused by the fuels and it is eco friendly.


Advantages :

          The robot eliminates the hazards caused due to the painting chemicals to the human painters such as eye and respiratory system problems and also the nature of painting procedure that requires repeated work and hand rising .


Abstract :

           Keeping in view the climate change, the dependence on petroleum reserves as the primary energy source, and volatile fuel prices, it is imperative to explore possible opportunities in unconventional alternative-fuel technologies. One of the choices available is the Compressed Air Vehicle (CAV), or air car, powered by a pneumatic motor and on-board high-pressure gas tank. While proponents claim CAVs offer environmental and economic benefits like zero emissions (in fact, the exhaust air is cleaner than the ambient air because of the filters used) and the cold exhaust being used for the air conditioning system, the technology has not been subject to more rigorous analysis. Also, in a compressed air engine, air alone can be used as the fuel, or it can be used in amalgamation with traditional fuels or electricity. Just using air is the most suitable option because it drastically reduces weight of the vehicle and improves the efficiency.

           Developing a whole vehicle to run on pneumatic systems will prove an outright tedious and without doubt a costly affair, modification of current internal combustion engines to run on compressed air is an avenue that this paper explores.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.