An Energy- Efficient User Centric Approach High Capacity SG Heterogeneous Cellular  Networks

An Energy- Efficient User Centric Approach High Capacity SG Heterogeneous Cellular Networks

₹2,000.00
Product Code: Matlab
Availability: In Stock
Viewed 6857 times

Product Description

Abstract:

               While the concept of ultra-dense small cell networks (SCNs) has brought a number of significant opportunities for the telecommunication industry, it has also introduced a major challenge for researchers, who must develop techniques to reduce the sharp increase in power consumption that will be required to backhaul traffic from SCNs to the core network. In this research, we investigate the green backhauling challenge for a fifth generation (5G) wireless communication network that uses both the passive optical network (PON) and millimeter wave (mmWave) backhauling to support its diverse groups of customers and applications. Our approach is based on the fact that the energy efficiency figures for the PON and the mmWave technologies are different under a given load condition. The PON technology is more energy efficient under heavy load conditions, whereas the mmWave technology offers better energy efficiency under low load conditions. As such, in response to varying traffic loads during various hours of the day, a fixed backhauling strategy is insufficient to guarantee the minimum power consumption and the required data rates. We formulate an optimization problem that considers the estimated hourly traffic load and determines the most energy efficient backhauling strategy for various hours of the day. Considering the complexity of the optimization problem, we also propose an energy efficient heuristic solution to solve this problem. Simulation results indicate that the proposed solution provides up to 32% more energy savings than the existing solution.

 

Proposed System

             In our Proposed work, we will further investigate this along with other energy-saving mechanisms (e.g.,sleep mode for lightly loaded RRUs) for C-RANs.The proposed work is most advantageous since the lightly loaded system reduce the power wastages.


Advantages in Proposed System

  • Programmable Mode of operation to save Energy

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.