Biobin For Safe Handling And Disposing Of Biomedical Waste During Covid '19

Biobin For Safe Handling And Disposing Of Biomedical Waste During Covid '19

₹10,500.00
Product Code: Embedded- IoT
Availability: In Stock
Viewed 7905 times

Product Description

Objective:

            Aim of the project is to build a movable smart dustbin to help COVID affected patients which can be controlled by android application.

Abstract:

          The world’s most populous country is India which faces a major problem in waste management. In India, smart city concept is still new, even though it has received a lot of attention in few years. A society can dispose the waste properly only when dustbins are placed and collected well. Waste collection and sorting is the main advantage of trash management. The major issues in the trash management are bin gets overflowed. This can create to a bad odor which may cause diseases badly. Waste collection, handling and management have been a hazardous task to the sanitary workers in this pandemic era. Various methods have been followed and introduced to handle this biomedical waste. It includes recycling, incineration, reduction and separation at the source. To avoid the spread of covid-19 virus and to help covid-19 affected patients we proposed a smart dustbin system. This smart dustbin is equipped with smart micro controller, level sensing unit, line following sensor unit, network connectivity and wheels. An android application is used to control the movement of dustbin in any direction.

            The proposed model can help the COVID affected patients to dispose the waste from their room to outside. It can eliminate the requirement of another person and will avoid the further spread of covid-19 virus.

Proposed System:

          The proposed smart bin can be move around the surroundings according to user inputs and can also indicate its level. The smart bin can be controlled by android application via BLE sensor and it sends the overflow status to the cloud database. It will reduce the waste management process and avoid the unnecessary entry of employee to quarantine region.

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.