Credit Coin: A Privacy-Preserving Block chain-Based Incentive Announcement Network for Communications of Smart Vehicles

Credit Coin: A Privacy-Preserving Block chain-Based Incentive Announcement Network for Communications of Smart Vehicles

₹2,000.00
Product Code: Java
Availability: In Stock
Viewed 2189 times

Product Description


Aim:

The main aim of this project is to develop an effective announcement network called Credit Coin, a new privacy-preserving incentive announcement network based on Block chain.

 

Synopsis:

Vehicular announcement network in VANETs (Vehicular ad hoc networks) have become one of the most promising vehicular communication applications, as it leads to a much safer vehicle-driving experience. Block chain-based networks are promising in recording credit data with the good properties of tamper resistance and decentralization, which is useful in VANET’s. We propose a vehicular announcement protocol Echo-Announcement in Credit Coin. It achieves efficiency and privacy-preserving for the practical usage in forwarding announcements. We design an incentive mechanism based on Block chain in Credit Coin. Users manage reputation points while they earn or spend coins as incentives. Meanwhile, Credit Coin still preserves privacy and achieves anonymity. Moreover, based on Block chain, Credit Coin prevents many security attacks and achieves conditional privacy because Trace manager will trace malicious nodes when an unexpected event occurs.

 

Proposed System:

In proposed system we propose a new technique called Credit Coin. It achieves efficiency and privacy-preserving for the practical usage in forwarding announcements. We design an incentive mechanism based on Block chain in Credit Coin. Users manage reputation points while they earn or spend coins as incentives. Meanwhile, Credit Coin still preserves privacy and achieves anonymity. Moreover, based on Block chain, Credit Coin prevents many security attacks and achieves conditional privacy because Trace manager will trace malicious nodes when an unexpected event occurs.


Modules:

Network Formation

Neighbor Calculation

Data Communication

Block Chain

Software Requirements:

  • Operating System       : Windows 7 and above (64-bit).
  • Python                         : 3.6
  • Java                             : Jdk 1.8

 

Hardware Requirement:       

  • Hard Disk                  : 500GB and Above
  • RAM                          : 4GB and Above
  • Processor                  : I3 and Above

 

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.