Design of Wearable Device for Child Safety

Design of Wearable Device for Child Safety

₹13,500.00
Product Code: Embedded- IoT
Availability: In Stock
Viewed 9926 times

Product Description


Objective

          Aim of the project is to develop a wearable device for Child safety within a child care environment such as playschool or any other educational institutions. This device should be able to track the location of students by teacher or care take with the help of sensor nodes installed within the school. After school time, child should be handover only to the facially verified parent/ guardian.

Abstract

            Daycare/ Educational institutions are great environment for children to gain more knowledge and have fun. Those institutions are not act like usual schools; here tracking of child location is quite difficult to caretaker or teacher. Our proposed system will simplify this process by adopting RFID technology. N numbers of RFID readers were installed around the buildings. Child will have the wrist band with RFID tag, whenever he cross the RFID reader his current position will automatically detected and updated to the cloud. Cloud database maintain the records of child’s moving history around the building by date wise and the current location. Care taker/ Teacher having the customized mobile application to view the child’s location history and location. This application fetches the data from cloud database and display in a list view. At the time child/ student leaving from school, his parent or guardian will be verified by face recognition system. Institution has the photo of parent of child and it will feed to the database of face recognition system. This system will extract the facial futures using CNN algorithm and build the face recognition model. This can be used to classify the live faces coming from webcam. Once the person identified as a parent of that student he will be handover by caretaker. If the person who came to pick up the child is not successfully verified by the system, it will send the alert message to registered parent’s mail id.

Proposed System

          Proposed system used to track the child location within the closed environment such as play school or daycare systems. In this method child need not to wear any complex electronic device. Here, a simple wrist band with RFID tag will be provided to track the location of child. Sensor nodes installed around the building will identify the location of child within institution.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.