Development and Analysis of Pothole detection and Alert based on Node MCU

Development and Analysis of Pothole detection and Alert based on Node MCU

₹11,500.00
Product Code: Embedded-IoT
Availability: In Stock
Viewed 11803 times

Product Description

Aim:

          The aim of this project is to detect pothole in the road and create the database. This record of potholes will help the road maintenance department to locate these bad roads. This can help to make maintenance work faster.


Abstract:

            One of the major problems in developing countries is maintenance of roads. Well maintained roads contribute a major portion to the country’s economy. Identification of pave-ment distress such as potholes and humps not only helps drivers to avoid accidents or vehicle damages, but also helps authorities to maintain roads. This paper discusses previous pothole detection methods that have been developed and proposes a cost-effective solution to identify the potholes and humps on the roads and provide timely alerts to drivers to avoid accidents or vehicle damages.Ultrasonic sensors are used to identify the potholes and humps and also to measure their depth and height, respectively. The proposed system captures the geographical location coordinates of the potholes and humps using a global positioning system receiver. The sensed-data include pothole depth, height of the hump, and geographic location, which is stored in the database (cloud).This serves as a valuable source of information to the government authorities and vehicle drivers. 


Proposed System:

            This system will make an online record of all the locations of potholes which were coming in the way of the vehicle having this system. This record of potholes will help the road maintenance department to locate these bad roads. This can help to make maintenance work faster. In this System the driver of the vehicle will be able to avoid the pothole as he/she can get alert.

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.