House Price Prediction Using Machine Learning And Neural Networks

House Price Prediction Using Machine Learning And Neural Networks

₹5,500.00 ₹4,000.00
Product Code: Python - Deep Learning
Availability: In Stock
Viewed 5941 times

Product Description

Aim:

          Housing prices keep changing day in and day out and sometimes are hyped rather than being based on valuation. Predicting housing prices with real factors is the main crux of our research project. Here we aim to make our evaluations based on every basic parameter that is considered while determining the price


Abstract:

            Real estate is the least transparent industry in our ecosystem. Housing prices keep changing day in and day out and sometimes are hyped rather than being based on valuation. Predicting housing prices with real factors is the main crux of our research project. Here we aim to make our evaluations based on every basic parameter that is considered while determining the price. We use various regression techniques in this pathway, and our results are not sole determination of one technique rather it is the weighted mean of various techniques to give most accurate results. The results proved that this approach yields minimum error and maximum accuracy than individual algorithms applied. We also propose to use real-time neighborhood details using Google maps to get exact real-world valuations


Proposed System:

          Our dataset comprises of various essential parameters and data mining has been at the root of our system. We initially cleaned up our entire dataset and also truncated the outlier values. Further, we weighed each parameter based on its importance in determining the pricing of the system and this led us to increase the value that each parameter withholds in the system. We shortlisted 3 different machine learning algorithms and tested our system with different combinations that can guarantee best possibly reliability of our results


Advantage:

            Even after that, we followed a unique approach to increase the accuracy, our survey led to a conclusion that the actual real estate value also depends on nearby local amenities such as railway station, supermarket, school, hospital, temple, parks etc. And now we propose our unique approach that can counter this need. We carried this out with manual examples and this gave us tremendous results in terms of accuracy in prediction


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.