Pneumatic Vice

Pneumatic Vice

** Delivery Charges Extra
CALL FOR PRICE
Product Code: Mechanical - Pneumatics
Availability: In Stock
Viewed 4769 times

Product Description

Aim:

            The main stay of the project is to design, mechanize and fabrication of a pneumatic vice to hold and release components easily.


Proposed System:

            Here we are going to create a pneumatic vice which has a pneumatic system installed to the vice, it assists the holding and releasing of the component. Pneumatic systems are easy to maintain and service, they are cost effective; they have high accuracy and reduces the cycle time in industries.


Advantages:-

  • Idle time of the machine is reduced.
  • When compared with the mechanical vices, it consumes less time for clamping and unclamping the job.
  • It reduces the manual labor
  • Hence, production rate is higher
  • Hydro-pneumatic vice having both the advantages of hydraulics and pneumatics


Abstract:

            In this project we are using the pneumatic as pressing equipment; this will be useful in many applications. Like bending the metal rods, bearing fixing and pattern making etc... Compressor is need to give the pressure for ON pneumatic.

            Here we are using one key, which act as a control switch for pneumatic. Microcontroller always check the key whether it is pressed or not, if the key is pressed, it will give a low pulse to the controller. When the controller receives a low pulse from key, then it ON a pneumatic for gripping the object.  When the key is pressed second time, the controller will off the pneumatic. So that the wise will release the object. This process will go repeatedly whenever the key is pressed.  These are all done by microcontroller coding. Air compressor is used for ON/OFF the pneumatic, when the compressed air is passed to the pressure control valve; the required pressure is obtained by adjusting its knob. When the air is passed to the flow control valve, the speed of movement of piston (pneumatic) is controlled by adjusting the knob.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.