IoT based Smart Bin- A Swachh-Bharat Initiative

IoT based Smart Bin- A Swachh-Bharat Initiative

₹11,500.00
Product Code: Embedded-IoT
Availability: In Stock
Viewed 10418 times

Product Description

Aim:

          The aim of this project is smart and automatic moving and waste disposed dustbin for older people, patients and industries.

Abstract:

Today main issue of pollution is Garbage Overflow. It creates unhygienic condition for the people and create a bad smell in surroundings leading to spread of some deadly diseases and human illness. To avoid all such situations we are going to implement a project called IoT Based waste management using smart dustbin for industries and older people. The implementation is done with the help of IoT concept. The Internet of Things (IoT) is a concept in which surrounding objects are connected through wired and wireless networks without user intervention. Objects communicate and exchange information. In this system, multiple dustbins are located throughout the city or the Campus, these dustbins are provided with a sensor which helps in tracking the level. When the level of the bin reaches the threshold limit, send to cloud. After that the dustbin will move for dispatch the excess waste to the particular navigated place. In order to avoid the decaying smell around the bin harmless chemical sprinkler is used which will sprinkle the chemical as soon as the smell sensors detect the decaying smell. Once the bins are full then the user will not be able to access the bins. 


Proposed system:

          In this proposed system is used to collect waste from industries or older people, dispose automatically by using the Arduino UNO controller. The LFRS (line following robotic system) is used for transporting the waste. The ultrasonic sensor is used to check the waste level. ESP8266 is continuously monitoring the dustbin status.

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.