360 Degree Trailer

360 Degree Trailer

** Delivery Charges Extra
₹15,000.00
Product Code: Mechanical - Automobile
Availability: In Stock
Viewed 5893 times

Product Description

Aim:

            The main stay of the project is to design, mechanize and fabrication of a 360 degree trailer which can tur or rotate in 360 degrees.


Proposed System:

           Here we are going to create a 360 degree trailer which can easily move in straight direction and can turn direction in all 360 degree with ease, this will make it easy to transport loads in industries. 


Advantages :

  • Minimize the time for dumping of materials.
  • Increase Moving ability, it does not become difficult to perform Operation.
  • Reduces extra cost paid on unloading of materials by labor or machine like crane or any pick and place machine.


Abstract:

          In industrial and domestic considerations, tippers can pull a variety of products including gravel, grain, sand, fertilizer, heavy rocks, etc. By consideringwide scope of the topic, it is necessary to do study and research on the topic oftipper mechanism in order to make it more economical and efficient. In existingsystem, tipper can unload only in one side by using pneumatic cylinder. By thisresearch it is easy for the driver to unload the trailer and also it reduces time andfuel consumption.For making tipper mechanism with such above conditions pneumaticcylinder can be used, this paper has mainly focused on above difficulty. Hence a prototype of suitable arrangement has been designed. The vehicles can beunloaded from the trailer in three axes without application of any impact force.The Direction control valves which activate the ram of the pneumatic cylinderwhich lifting the trailer cabin in require side. By this research it is easy for thedriver to unload the trailer and it reduces the time.  


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.