Automatic Gear Changer
- Blog
- Mini Projects
- Order cancellation
- Privacy policy
- Project Categories
- Return Policy
- Terms and Conditions
- Terms of use
- Discount
-
Projects
- Embedded
- Java
-
Matlab
- 5G Communication/Signal Processing
- ANTENNA Design
- Artificial intelligence
- Automation & Fault Detection
- Cryptography- Authentication
- Cyber Security
- Data Analytics
- Deep Learning
- Digital Image Processing
- GAN
- Machine Learning
- Matlab Hardware Interface
- Medical Imaging
- Robotic OS (ROS) - Hardware
- Robotic OS (ROS) - Simulation
- Web Application
- Mechanical
- Python
- VLSI
- Workshops
- Internship
Your shopping cart is empty!
Product Description
Aim :
The Automatic gear changer system is used to change the gear in a tensionless manner.
Proposed system :
The Automatic gear changer system is used to change the gear in a tensionless manner. In this system a fuel power is not required to change the gear. So, that the human energy will not be wasted.
Advantages :
• Energy is saved
• Low cost
• Easy operation
Abstract :
The Automatic gear changer system is used to change the gear in a tensionless manner. In this system a fuel power is not required to change the gear. So, that the human energy will not be wasted. The system consists of a battery electronics control board, soft gear mechanism through which the signals are given to the control board which with control the motor which will in turn change the hard gear. Thus the soft hand gear system for two wheelers work.
This type of system can be implemented in vehicles. Here through the soft gear or switching system we can set the gear we want. The gear changing motor which is a stepper motor will rotate according to the gear required. The electronic control board makes all the controls in the system.
When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.
The total time it takes to receive your order is shown below:
The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.
Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.
Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.
Shipping from your local warehouse is significantly faster. Some charges may apply.
In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!
Download Abstract
Click the below button to download the abstract.
Package Includes
Software Projects Includes
- Demo Video
- Abstract
- Base paper
- Full Project PPT
- UML Diagrams
- SRS
- Source Code
- Screen Shots
- Software Links
- Reference Papers
- Full Project Documentation
- Online support
The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days
Hardware Projects Includes
- Demo Video
- Abstract
- Base paper
- Full Project PPT
- Datasheets
- Circuit Diagrams
- Source Code
- Screen Shots & Photos
- Software Links
- Reference Papers
- Lit survey
- Full Project Documentation
- Online support
The Delivery time for Hardware
projects is 7-8 working days.
Mini Projects: Software Includes
- Demo Video
- Abstract
- Base paper
- Full Project PPT
- UML Diagrams
- SRS
- Source Code
- Screen Shots
- Software Links
- Reference Papers
- Full Project Documentation
- Online support
The
Delivery time for software Miniprojects is 2 -3 working days.
Mini Projects - Hardware includes
- Demo Video
- Abstract
- PPT
- Datasheets
- Circuit Diagrams
- Source Code
- Screen Shots & Photos
- Software Links
- Reference Papers
- Full Project Documentation
- Online
support
The Delivery time for Hardware Mini projects is 7-8 working days.