Pneumatic Tail Stock

Pneumatic Tail Stock

** Delivery Charges Extra
CALL FOR PRICE
Product Code: Mechanical - Pneumatics
Availability: In Stock
Viewed 4470 times

Product Description

Aim :

          The scope of this project to move the tailstock by using pneumatic method.


Proposed system :

          The pneumatic lathe tailstock is simple in structure, the piston rod is adopted to drive the transmission guide rod to move front and back and drive the tailstock sleeve and the center to realize the clamping and release of a workpiece, the labor intensity of operators can be effectively lightened, and the production efficiency can be enhanced.


Advantages :

  • During work is held between focus the weight is consistent.
  • We land high weight when the position is holding between focuses, so we get high soundness.
  • Quick task.


Abstract :

          The utility model relates to a pneumatic lathe tailstock which comprises a center, a tailstock sleeve and a tailstock body, as well as a cylinder, wherein the tailstock sleeve is arranged on the tailstock body, the center is arranged at one end of the tailstock sleeve, the cylinder is fixed at the tail part of the tailstock body through a cylinder flange plate, a piston rod of the cylinder extends in the tailstock body after penetrating through the cylinder flange plate, a first connecting piece, a transmission guide rod and a second connecting piece are arranged in the tailstock body, the piston rod is connected with the transmission guide rod through the second connecting piece and a pin, the other end of the transmission guide rod is connected with the tailstock sleeve through the first connecting piece and a bolt, and the tailstock body is also provided with pressure-stabilizing control regulation filters. The pneumatic lathe tailstock is simple in structure, the piston rod is adopted to drive the transmission guide rod to move front and back and drive the tailstock sleeve and the center to realize the clamping and release of a workpiece, the labor intensity of operators can be effectively lightened, and the production efficiency can be enhanced.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.