Time Series Analysis based Tamilnadu Monsoon Rainfall Prediction using Seasonal ARIMA

Time Series Analysis based Tamilnadu Monsoon Rainfall Prediction using Seasonal ARIMA

₹5,500.00 ₹4,000.00
Product Code: Python - Machine Learning
Availability: In Stock
Viewed 10271 times

Product Description

Aim:

           Analyze the rain fall data from database for rain prediction.

Abstract:                           

           Rainfall prediction is a major problem for meteorological department as it is closely associated with the economy and life of human. It is a cause for natural disasters like flood and drought which are encountered by people across the globe every year. Accuracy of rainfall forecasting has great importance for countries like India whose economy is largely dependent on agriculture. This paper presents the rainfall prediction and Rainfall analysis using Machine Learning. The main goal of employing this application is to prevent immediate impacts of flood. This application can be easily used by the common people or government to predict the occurrence of flood beforehand. The advancement in the information technology, the need for easy accessibility of large cloud storage and processing power is available. Data mining technologies helps us to provide reference for decision makers as summarized information even from the large amount of data. Among many data mining techniques, classification is a widely used one. Past studies proposed many techniques that could be applied to classification, such as decision trees, neural networks, Bayesian classifiers. Here we use Linear model and Neural Network.

Proposed System:

         The aim of this project is to get all the rainfall data and from a dataset containing yearly rainfall data. To overcome the fallback in the existing system we propose a machine learning based system to increase the efficiency and accuracy. In our project, linear model gives high accuracy level compared with other algorithms. Finally, we are predicting the result via data visualization and display the predicted output GUI.

When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.