Failure Analysis of Internal Combustion Engine Valves by using ANSYS

Failure Analysis of Internal Combustion Engine Valves by using ANSYS

₹5,000.00
Product Code: Mechanical - Design and Analysis
Availability: In Stock
Viewed 2131 times

Product Description

Abstract

             Intake and exhaust valves are very important engine components that are used to control the flow of intake and exhaust Gases in internal combustion engines. They are used to seal the working space inside the cylinder against the manifolds; and are opened and closed by means of what is known as the valve train mechanism. These valves are loaded by spring forces and subjected to thermal loading due to high temperature and pressure inside the cylinder. The present study is forced on different failure modes of internal combustion engine valves. Failures due to fatigue, high temperature effects, and Failures due to impact load that depends on load and time. For the study of fatigue life, a combined S-N (max. stress v/s number of cycles) curve is prepared. Such a curve helps in comparing the fatigue failure for different materials at different high temperatures and may also assist the researchers in developing the valve materials with a prolonged life. For achieving above sad goals couple –field, fatigue and transient analysis will be done on valves to determine structural and thermal behavior in working condition.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.