Design and Development of Aqua Silence

Design and Development of Aqua Silence

** Delivery Charges Extra
₹6,000.00
Product Code: Mechanical - Fabrication
Availability: Pre-Order
Viewed 1135 times

Product Description

            Air pollution is most important from the public health of view, because every individual person breaths approximately 22000 times a day, inhaling about 15 to 22 kg of air daily. Polluted air causes physical ill effect decides undesirable aesthetic and physiological effects. Air pollution can be defined as addition to our atmosphere of any material, which will have a dexterous effect on life upon our planet. The main pollutants contribute by automobile are carbon monoxide (CO), unburned hydrocarbon (UBHC), oxides of nitrogen (NOx) and Lead. Automobiles are not the only sources of air pollution, other sources such as electric power generating stations, industrial and domestic fuel consumption, refuse burning, industrial processing etc. also contribute heavily to contamination of our environment so it is imperative that serious attempts should be made to conserve of our environment from degradation. An Aqua Silencer is an attempt, in this direction, it is mainly dealing with control of emission and noise. An Aqua Silencer is fitted to the exhaust pipe of engine. Sound produced under water is less hearable than it produced in atmosphere. This mainly because of small sprockets in water molecules, which lowers its amplitude thus, lowers the sound level. Because of this property water is used in this silencer and hence its name AQUA SILENCER. The noise and smoke level is considerable less then the conventional silencer, it is cheaper, no need of catalytic converter and easy to install.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

<h2>Download Abstract</h2>
<div class="download-abstract">
    <p>Click the below button to download the abstract.</p>
  <button id="download-btn" style="border:none"><a href="image/abstract/projects/mechanical/Design and Development of Aqua Silence.docx" style="color: firebrick;">Download</a></button>
</div>

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.