Gasifier

Gasifier

** Delivery Charges Extra
CALL FOR PRICE
Product Code: Mechanical - Motorized
Availability: Pre-Order
Viewed 4466 times

Product Description

Aim:

            The main stay of the project is to design, mechanize and fabrication of a Gasifier which separates biogas from wood chips.


Proposed System:

Here we are going to create a Gasifier which uses wood chips as its primary source to produce biogas. In our project we are taking certain safety precautions which include a temperature sensor, pressure sensor, it is cost effective.


Advantage :

1.                   It is well known that adding a gas fireplace in your home will help you save on your energy bill and that it will add comfort and coziness to your house, even in summer. One thing that is often forgotten though, is that it will also increase the resell value of your property. Therefore, a gas fireplace is a sound investment.


2.                In today’s world, most of us are concerned about the environment. Gas fireplaces are a good way to protect it, since it releases no fumes into the air. Also, gas is a natural resource which there is plenty of and is easily acquired.


3.            You may ask “Why use gas instead of wood?” There are a few pluses when it comes to the comparison between the two. First of all, the gas fireplace provides constant and stable heating, something you cannot control when using logs. Secondly, you won’t have to exert yourself by chopping wood, while at the same time, you’ll be protecting the environment by saving trees from being cut in the forest. Furthermore, it is really easy to turn on and off, through the flip of a switch, unlike the other one which takes time to fire up. Finally, you won’t have to clean the fireplace regularly, as you would with one using wood.


Abstract:

         Today’s Energy Hungry World is consuming non-renewable sources of energy such as fossil fuels at alarming rates, which has increased the importance of developing renewable energy sources. Biomass is one such source of renewable energy which is abundantly available in India in the form of industrial and agricultural by-products. In this project we aim to contribute in a small way to this changing face of sustainable energy resources by designing and fabricating a downdraft gasifier using wood pellets.


When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Download Abstract

Click the below button to download the abstract.

Package Includes

Software Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support


The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days

 

Hardware Projects Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. Datasheets
  6. Circuit Diagrams
  7. Source Code
  8. Screen Shots & Photos
  9. Software Links
  10. Reference Papers
  11. Lit survey
  12. Full Project Documentation
  13. Online support


The Delivery time for Hardware projects is 7-8 working days.

   

Mini Projects: Software Includes

  1. Demo  Video
  2. Abstract
  3. Base paper
  4. Full Project PPT
  5. UML Diagrams
  6. SRS
  7. Source Code
  8. Screen Shots
  9. Software Links
  10. Reference Papers
  11. Full Project Documentation
  12. Online support

 

The Delivery time for software Miniprojects is 2 -3 working days.

 

Mini Projects - Hardware includes

  1. Demo  Video
  2. Abstract
  3. PPT
  4. Datasheets
  5. Circuit Diagrams
  6. Source Code
  7. Screen Shots & Photos
  8. Software Links
  9. Reference Papers
  10. Full Project Documentation
  11. Online support

The Delivery time for Hardware Mini projects is 7-8 working days.