Fabrication of Pneumatic Railway Gate Control System
- Blog
- Mini Projects
- Order cancellation
- Privacy policy
- Project Categories
- Return Policy
- Terms and Conditions
- Terms of use
- Discount
-
Projects
- Embedded
- Java
-
Matlab
- 5G Communication/Signal Processing
- ANTENNA Design
- Artificial intelligence
- Automation & Fault Detection
- Cryptography- Authentication
- Cyber Security
- Data Analytics
- Deep Learning
- Digital Image Processing
- GAN
- Machine Learning
- Matlab Hardware Interface
- Medical Imaging
- Robotic OS (ROS) - Hardware
- Robotic OS (ROS) - Simulation
- Web Application
- Mechanical
- Python
- VLSI
- Workshops
- Internship
Your shopping cart is empty!
Product Description
Aim:
The aim of project is to control the gate opening and closing with the help of pneumatic cylinder arrangement. In our project the gate always opened. This will close when the pneumatic operated cylinder is actuated.
Proposed System:
This type of gate locking system is used for security purpose. This unit will operate using pneumatic cylinder so less man power is required. This pneumatic operation is some faster than other methods. So this leads to efficient operation.
Advantages:
- Faster operation
- Simple in construction
- Easy to maintain and repair
- Cost of the unit is less when compared to other methods
Abstract:
The aim of project is to control the gate opening and closing with the help of pneumatic cylinder arrangement. In our project the gate always opened. This will close when the pneumatic operated cylinder is actuated.
The compressed air from the compressor is passed to the solenoid valve which controls the direction of flow of air to the pneumatic cylinder. Initially the pneumatic cylinder is in rest condition at the time the gate is opened. The compressed air from the solenoid valve is passed to cylinder in order to actuate the piston. Then the gate will automatically close, because the piston rod is coupled with the one end of the gate. After sometime the direction of compressed air is controlled and it is passed to the cylinder which actuate the piston rod and the cylinder return to initial position. Now the gate is opened position.
This type of gate locking system is used for security purpose. This unit will operate using pneumatic cylinder so less man power is required. This pneumatic operation is some faster than other methods. So this leads the efficient operation in this operation.
When you order from finalyearprojects.in, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.
The total time it takes to receive your order is shown below:
The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.
Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.
Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.
Shipping from your local warehouse is significantly faster. Some charges may apply.
In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!
Download Abstract
Click the below button to download the abstract.
Package Includes
Software Projects Includes
- Demo Video
- Abstract
- Base paper
- Full Project PPT
- UML Diagrams
- SRS
- Source Code
- Screen Shots
- Software Links
- Reference Papers
- Full Project Documentation
- Online support
The Delivery time for software projects is 2 -3 working days. Some of the software projects will require Hardware interface. Please go through the hardware Requirements in the abstract carefully. The Hardware will take 7-8 Working Days
Hardware Projects Includes
- Demo Video
- Abstract
- Base paper
- Full Project PPT
- Datasheets
- Circuit Diagrams
- Source Code
- Screen Shots & Photos
- Software Links
- Reference Papers
- Lit survey
- Full Project Documentation
- Online support
The Delivery time for Hardware
projects is 7-8 working days.
Mini Projects: Software Includes
- Demo Video
- Abstract
- Base paper
- Full Project PPT
- UML Diagrams
- SRS
- Source Code
- Screen Shots
- Software Links
- Reference Papers
- Full Project Documentation
- Online support
The
Delivery time for software Miniprojects is 2 -3 working days.
Mini Projects - Hardware includes
- Demo Video
- Abstract
- PPT
- Datasheets
- Circuit Diagrams
- Source Code
- Screen Shots & Photos
- Software Links
- Reference Papers
- Full Project Documentation
- Online
support
The Delivery time for Hardware Mini projects is 7-8 working days.